Straight Edge Interiors quotes plastering from drawings for Wellington architects, interior designers and builders. Level 5 and other architectural details are priced as their own finish level, and the work is scheduled around the programme, other trades and drying time.
What to send
Plans, finish level and programme
Send the project location, plans or a note that plans are available, the finish level if it is specified (Level 4, Level 5, or not sure), the programme start if you know it, the project stage, and a short description. The form accepts up to four images under 1.2 MB each. PDF plans are not accepted on the form. Email drawings to seinteriorsltd@gmail.com.
A lighting plan and the board type help when Level 5 is being considered, because critical light and the lining are what the finish has to survive. If you do not have them yet, say so. Jeremy can still tell you whether a site visit is the next step.
Quote
Scope, finish level and timing
The quote separates scope, finish level, and timing. Work is scheduled around access, other trades, and drying time.
01 Send photos, plans, location, and the rough scope.
02 Jeremy confirms whether a site visit is needed.
03 The quote separates scope, finish level, and timing.
04 Work is scheduled around access, other trades, and drying time.
Builders
Commercial subcontracting
Yes. Commercial subcontracting is part of the published work, including framing, suspended ceilings, fitouts and stopping. Choose Builder / contractor on the form.
The commercial page covers mezzanine fitouts, suspended ceilings, stair bulkheads and large ceiling runs. Commercial plastering.
FAQ
Trade enquiry questions
What should architects and builders send?
Send the project location, plans or a note that plans are available, the finish level if it is specified (Level 4, Level 5, or not sure), the programme start if you know it, the project stage, and a short description. The form accepts up to four images under 1.2 MB each. PDF plans are not accepted on the form. Email drawings to seinteriorsltd@gmail.com.
How are quotes separated?
The quote separates scope, finish level, and timing. Work is scheduled around access, other trades, and drying time.
Can builders use this as a subcontract enquiry?
Yes. Commercial subcontracting is part of the published work, including framing, suspended ceilings, fitouts and stopping. Choose Builder / contractor on the form.
Enquiry
Trade enquiry form
Architect / designer is selected. Change it if you are the builder.